| View previous topic :: View next topic |
| Author |
Message |
donw
Joined: 25 Dec 2001 Posts: 376 Location: Indiana
|
Posted: Tue Nov 02, 2004 12:25 am Post subject: More Submarines Needed |
|
|
Sorry..here's the story...
In his Oct. 12 op-ed column David Ignatius called the Virginia-class submarine program a "Cold War legacy," but in fact the Virginia class was designed for post-Cold War operations.
Other nations are developing and fielding increasingly capable submarines that pose a potential threat to U.S. forces. The Virginia-class submarine is designed to operate and ensure access in the littorals, covertly performing multiple missions including intelligence and surveillance, strike operations, antisubmarine warfare, and Special Operations Forces delivery and support, while maintaining deep ocean dominance. The first Virginia-class submarine was delivered to the Navy Oct. 12.
At the end of the Cold War, the Navy had about 100 nuclear attack submarines. That number has dwindled to 53, and they are stretched thin meeting demands for their stealthy and unique capabilities.
The Virginia class is the planned replacement for Los Angeles-class submarines, which soon will be reaching retirement age, but the current build rate will not allow for full replacement of the remaining Los Angeles-class submarines before they are decommissioned.
So rather than cancel the program, as Mr. Ignatius suggested, the build rate should be increased to provide sufficient replacement submarines to meet the nation's requirements.
JOHN S. HEFFRON, Captain, U.S. Navy, Virginia-Class Program Manager, Washington
Last edited by donw on Tue Nov 02, 2004 12:43 am; edited 1 time in total |
|
| Back to top |
|
 |
TLAM Strike
Joined: 30 Apr 2002 Posts: 4866 Location: Rochester, New York
|
Posted: Tue Nov 02, 2004 12:34 am Post subject: |
|
|
Can't access it...  |
|
| Back to top |
|
 |
Torpedo Fodder
Joined: 02 Aug 2003 Posts: 1224 Location: Whitby, Ontario
|
Posted: Tue Nov 02, 2004 2:50 am Post subject: |
|
|
| Due to how costs are broken down in the US military's procurement system, it occurs to me that the Navy will actually save money in the long run if they up the procurement schedule of the Virginias from 1 a year to 2 a year... |
|
| Back to top |
|
 |
|
|
You cannot post new topics in this forum You cannot reply to topics in this forum You cannot edit your posts in this forum You cannot delete your posts in this forum You cannot vote in polls in this forum
|
Powered by phpBB © 2001, 2005 phpBB Group
|