| Author |
Carrier Contract awarded |
XabbaRus
Joined: Feb 28, 2002 Posts: 2792 | Posted: 2003-01-30 07:09  
BAe Systems has got the bulk of the contract but also some of it has been split with Thaled.
The BAe design must incorporate some of the Thales design features must be included.
The best thing is all the work is to be done in the UK.
_________________
Project 971
 
|
Te Kaha
Joined: Feb 28, 2002 Posts: 1697 From: Austria & Aotearoa
| Posted: 2003-01-30 07:44  
No Croissants then on the carriers?
_________________ Te Kaha's Missions
America's Cup 2003, Auckland, NZ; Alinghi - Team New Zealand 3-0
 
|
Te Kaha
Joined: Feb 28, 2002 Posts: 1697 From: Austria & Aotearoa
| Posted: 2003-01-30 16:43  
Another one, the artists impressions of the future carriers vary very much; on the RN homepage, a carrier with a similar looking superstructure to the Illustrious and with a flat flight deck is shown, while at BBC Online, in the article about the contract, a carrier with two islands and a huge skijump is shown...
Does anybody know how the carriers will look like?
_________________ Te Kaha's Missions
America's Cup 2003, Auckland, NZ; Alinghi - Team New Zealand 3-0
 
|
Konovalov
Joined: Nov 05, 2002 Posts: 328 From: Australia but in UK at moment.
| Posted: 2003-01-31 17:19  
I reckon BAe were pretty worried about this one. Their recent record has not been good such as the Nimrod upgrade delays and so forth. It must have been one hell of a $$$$$ sigh of relief for the company. Good on them.
_________________ "All ahead flank! Inquire with the engineer about the possibility of going to 105 percent on the reactor?"
 
|
XabbaRus
Joined: Feb 28, 2002 Posts: 2792 | Posted: 2003-02-01 17:24  
Ah but you know why they are having problems with the Nimrod?
They made brand new effiecient modern wings, something that BAe specialises in. When they went to attach them to the fuselage, they found that don't fit. Why? The aircraft they are working on are around 40 years old and were hand built so each varies in the accuracy of the fitting points No super accurate tools and jigs. So they have had to refit and rebuild stuff. Takes time. Now you might have thought that obvious but I can see how something like that can be overlooked.
About the Astute project, they took that on when they tool over GEC-Marconi's ship building division, and looks like they inherited some management problems.
_________________
Project 971
 
|
Posiden
Joined: Aug 29, 2002 Posts: 439 From: new jersey
| Posted: 2003-02-01 17:54  
hmm, thats interesting, i never heard that before
 
|
Ramius
Joined: Feb 27, 2002 Posts: 1932 From: United Kingdom
| Posted: 2003-02-01 18:45  
yep, heard a while back about the wings not fitting
Ramius
_________________
SCX Model Previews
 
|
Konovalov
Joined: Nov 05, 2002 Posts: 328 From: Australia but in UK at moment.
| Posted: 2003-02-02 12:22  
Interesting info Xabba. Thanks.
_________________ "All ahead flank! Inquire with the engineer about the possibility of going to 105 percent on the reactor?"
 
|